US Army Corps of Engineers Westside Creeks Ecosystem Restoration Feasibility Study

July 11, 2012 - 6:00pm
Guadalupe Cultural Arts Theater
1300 Guadalupe Street
San Antonio, TX 78207

July 12, 2012 - 6:00pm
Salvation Army Peacock Center
2710 W. Ashby Place
San Antonio, TX 78201

Join Our Mailing List

To be added to our project mailing list, please send an e-mail to sara@sara-tx.org. The project mailing list will be continually updated throughout the process and will help us keep stakeholders informed about upcoming meetings and events. 

Read our Privacy Policy.

SARA Logo

News Room

The News Room is full of resources for the media and the general public. Choose a link below to skip to specific information located on this page:

Frequently Asked Questions

To view a PDF of the Frequently Asked Questions, click here.

Who is conducting this project?

Where is the project area?

What is the purpose of the project?

How will the creeks be restored?

When will the Conceptual Designs recommended by this project be built?


Who is conducting this project?Back to FAQ's
The San Antonio River Authority (SARA) is conducting the Westside Creeks Restoration Project, a community-based planning effort. To assist during the Conceptual Design Phase, SARA has hired a team of consultants.

Where is the project area?Back to FAQ's
The project area includes approximately 14 miles of the Alazán, Apache, Martinez, and San Pedro Creeks, primarily located in the city’s urban core.  For a better understanding of the project limits, please see the project map.

What is the purpose of the project?Back to FAQ's
While currently in the Conceptual Design Phase, the ultimate project is expected to: 

The Conceptual Design Phase includes a significant public involvement effort led by an oversight committee comprised of two co-chairs and community leaders representing 20 organizations throughout the city and the city’s Westside.  Once implemented, the project will provide increased opportunities for the creeks in the city’s urban core and will be enjoyed by people from all walks of life and all parts of the county.

How will the creeks be restored?Back to FAQ's
The Westside Creeks Restoration Project aims to create concepts for restoring the creeks in such a way that keeps with the rich historical and cultural background of the community.  The project will seek to incorporate key historical and cultural features into the design of the project in order to reflect the community and contextualize the project.

Today, the Westside Creeks’ primary function is flood control.  They contain little vegetation, are lined with concrete or concrete rubble, and exist to quickly move water during flood events. The Westside Creeks Restoration Project will provide concepts for ecosystem restoration that will increase the biological stability of the creeks and reintroduce native plant and wildlife. Through a citizen-driven conceptual design process, community input will drive the design concepts for environmental restoration of the creeks while maintaining efficient and effective flood control.

When will the Conceptual Designs recommended by this project be built?Back to FAQ's
Currently, there are no funds immediately available and, additionally, the project would need to proceed to detailed design before it is ready for implementation.  Once a design has been further refined and cost estimates prepared, funding will be sought to implement the project in phases similar to the work currently being done by the City of San Antonio, Bexar County, US Army Corps of Engineers, SARA, and the San Antonio River Foundation on the San Antonio River Improvements Projects.

News Releases Back to Top

Click on the links below to view PDFs of recent and past news releases for the project.

(April 10, 2009) Local Officials Join Oversight Committee to Kick Off Public Outreach Efforts

(April 17, 2009) Westside Creeks Restoration Project Makes its debut at Earth Day with an all-ages Westside Creeks Imagination Station

Meeting HandoutsBack to Top

Click on the links below to view PDFs of the presentation and handouts presented at each of the three Public Workshops.

(None at this time.)

Published ArticlesBack to Top

Click on the links below to view PDFs or online articles of recent and past articles published about the project.

Lucio, Valentino. (February 17, 2009). Creek restoration on drawing board. San Antonio Express-News.

Ayo, Elaine. (April 14, 2009). Urban oases await rebirth. San Antonio Express-News.

Davila, Vianna (December 19, 2009). Ground broken for greenbelt. San Antonio Express-News.

Ortiz, Jacqueline (January 6, 2010). West Side a step closer to creek restorations. WOAI.com.

Maps and RenderingsBack to Top

Click on the links below to view PDFs of maps, renderings and photographs developed for the project.

Project Area Map

Workshop #1 Summary

Workshop #2 Catalyst Sites